Training

Injection Molder Advanced

Level

2B

Type

ON-MACHINE

Time Estimate1.5 hrs.
Prerequisites

Injection Molder - 2A Mold Design Concepts

Access Gained
  • Access with compatible materials, metal and 3D printed molds, and clamping force > 10 tons (upper platen access)
User Level

ADVANCED USER 

Objectives
  • Understand when and how to use the upper platen.
  • Setup the 3D printed mold and MUD system.
  • Injection mold a part in a 3D printed mold.
Checklist/Document

Training Checklist:

Training Script:

Molding Plan: (Choose preferred format)

PDF: 

Doc: 

Sheet:

Models
Design Guides
N/A
Other
N/A

Google Apps Sign-in Required

You must sign-in to your uAlberta Google apps account to download these files.