Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

...

Page properties


Training

Injection Molder Introduction

Level

1B

Type

Status
subtletrue
colourGreen
titleon-machine

Time Estimate1.5 hrs.
Prerequisites

Injection Molder - 1A Fundamentals

Access Gained
  • Access with compatible materials, metal molds and clamping force < 10 tons (no upper platen access)
User Level

Status
colourBlue
titlebasic user
 

Objectives
  • Understand injection molder safety and molding basics.
  • Create a molding plan.
  • Setup the mold and molding parameters.
  • How and when to purge the barrel.
  • Injection mold a simple part.
  • Recognize signs of a good part.
Checklist/Document

Training Checklist:

Google Drive Live Link
urlhttps://drive.google.com/file/d/1CJKYdSv4xBbIVHJQUm8kyBj8mQmZYVU7/view?usp=drivesdk

Training Script:

Google Drive Live Link
urlhttps://drive.google.com/file/d/1ZaN2y_GO2ZrnqQIBm_c-y19rFfLq8oPi/view?usp=sharing

Molding Plan: (Choose preferred format)

PDF:

Google Drive Live Link
urlhttps://drive.google.com/file/d/13wU1V7xNIrNLn0ntrz30NKx8TNOHiDOG/view?usp=sharing

Doc: 

Google Drive Live Link
urlhttps://docs.google.com/document/d/14NCElsUVpKhzKO3a7gcH0bTgVyXSexdo/edit?usp=sharing&ouid=108978041892966594586&rtpof=true&sd=true

Sheet: 

Google Drive Live Link
urlhttps://docs.google.com/spreadsheets/d/1knE0g287jvpMMh-qTTHJT0lMNRW3Gc_muXhmNp8CRHg/edit?usp=drive_link

Models
Design Guides
N/A
Other
N/A



Note
titleGoogle Apps Sign-in Required

You must sign-in to your uAlberta Google apps account to download these files.

...